Today's IANA depletion date estimate:


Two more down

2010-05-08

Yesterday IANA announced that they allocated 31/8 and 176/8 to RIPE NCC. LACNIC and APNIC will most likely allocate two blocks each soon. It looks like we only are going to have 9 usable block after this summer.

The total allocation rate from the RIR’s to its members has been very high lately, around 1.3-1.4 /8 block per month. All regional registrars except for ARIN that serves North America have seen an unusual high allocation rate. Even AfriNIC have currently a higher burn rate than ARIN. A recent allocation of 2 million addresses to Agence Tunisienne Internet in Tunisia contributed to AfriNIC’s high burn rate. (see the dashbord for a summarized view over burn rates, http://www.ipv4depletion.com/old.html)

9 blocks and 1.4 blocks per month in burn rate. You don’t have to have a master degree in mathematics to realize that it is time for IPv6.

Tags:

3 Responses to “Two more down”

  1. Tweets that mention The IPv4 Depletion site » Blog Archive » Two more down -- Topsy.com says on :

    [...] This post was mentioned on Twitter by It's a Web Thing. It's a Web Thing said: IPv4 Depletion: Yesterday IANA announced that they allocated 31/8 and 176/8 to RIPE NCC. LACNIC and APNIC will mos… http://bit.ly/b9SDY2 [...]

  2. eXile says on :

    Aren’t there 13 blocks left (18 – 5)?

  3. admin says on :

    Hi exile,

    You are right, there are 13 blocks left. But both LACNIC and APNIC are close to requesting new blocks so we will only have 9 blocks AFTER the summer.

    18 – 2 – 2 – 5 = 9

    Thanks, S

Leave a Reply